At the end of August, the Shell filling station on Plesmanlaan will close. From then on, it will no longer be possible to drive from Vossiusplein to Plesmanlaan via the filling station. Yellow signs will indicate the closure in advance.
Work on cables and pipes around Plesmanlaan will start in October. Following this, trees will be cut down.
Bike tunnel and bike lanes close
As cables and pipes run under the cycle paths, the cycle tunnel between Vondellaan and Darwinweg, the cycle paths along Plesmanlaan and along Darwinweg to Mendelweg will have to be closed from 1 January 2025. Cycle traffic will be diverted. It is planned that cyclists will then travel via Zernikedreef (diversions north) or via Jan Luikenlaan/Muiderkring (diversions south). Proposed alternative routes are shown on the map below.
Red dotted line: Bike lane closure from 1 January 2025 to (phased) end of 2027. Yellow line: ‘District traffic’ Diversion of cyclists and pedestrians in the district. Green line: ‘Through traffic’ Diversion of cyclists and pedestrians.
Information evening in September
in the second half of September, the municipality, together with Boskalis, will hold an information evening about the work.
Stay informed via the Boskalis Projects App
Wilt u tijdens de werkzaamheden op de hoogte blijven van alles wat er gebeurt? Then download the Boskalis Projects App or the Construction App from the Apple app store and/or Google Play app store. Binnenkort kunt u hier het project ‘Plesmanlaan – Leidse Ring Noord’ vinden. U kunt het project als favoriet aanvinken door op het sterretje te klikken. Dan krijgt u een melding als er een nieuw bericht is geplaatst.